Progress has been slow. With the holidays, weather, work, blah, blah, blah....I knew the detail work was going to take time, but definitely underestimated it. Anyway, here's an update of some of the work over the last month.
The counter tops are installed. I was skeptical of how they would look, but wife nailed the colors.
These are shots of the upstairs. Flooring is in and I'm now working on the trim.
As soon as the bathroom tiling is done I can install the bathroom doors and vanity, then finish all the trim upstairs. Did manage to get all the ceiling fans installed and put down a rubber floor for the wife's workout area.
The elevator has been a problem from the start. The contractor is horrible on meeting deadlines or showing up when they say they will. No communication either, I've had to continually call and get pissed with them to get the work done. Makes me wonder how maintenance will be and if there are breakdowns.
Here's a couple shots of the mechanism and equipment in the basement. Supposedly they are bringing a 3-man crew this week to finish it up.
My goal is to finish all the trim, including filling holes and re-touching up the paint by the end of the month. Also plan on using 3/4 black pipe and cedar for the shelving. Hoping I can get those done this month too.
Once we are actually living in it, then I can start working on the bay area which should be more in line with what the Garage Journal is all about! While it's going to be the "living room", I'm going to have a lift with a couple cars and our motorcycles in it as well. I may have posted these pics before, but here's what I really want to be working on!
Won't be doing any work on cars/motorcycles here. That's what the other shops are for, but it's going to be a great place to hang out, watch tv, and drink a beer.