Officially the Constructors holiday lasted until today, so this means the work officially starts again on next monday, However the plumber already showed up last week to install the basic house connections in both house parts this week - which means i have finally something to update you about again:
Main connections in our "technical room", including an "input filter" and a prepared piece of piping where the "clock" / "water counter" will go:
And in the In-laws area:
Our area is mostly based on Limestone, thats why we have prepared connections for a Mineral-removing system (Based on Ionic-exchange with Salt) so our coffee-machine and everything will stay free of calcium and last longer. It also makes the water feeling softer (you can feel a huge difference) and you need less fabric softener and washing detergent when cleaning stuff. No More white calcium stains everywhere

The system will go at the two red connections..
The Sink connection in the in-laws garage space:
One of the in-wall toilet cisterns
Some of the main sewage tubes (insulated, because it's in the outside wall)
Oh and a friend of ours offered us a beautiful modern Oaktree-Hardwood table for free, so i absolutely had to take it
I expect the work to pick up again slowly next week because of short days, cold temperatures and lots of snow everywhere. The advantage is, you can draw the missing walls into the snow at the moment