I am getting ready to install the shower base in my basement. It is a multi piece Sterling unit. The shower base has raised ribs/ gussets underneath that support it. The unit "rocks" back and forth on the floor front to back because there is a slight high spot in the concrete right by the shower drain. My plan was to file or grind down the ribs on the shower that are causing it to rock and make it sit flat. I plan on bedding it in mortar so my thought is even if I grind to much off the mortar will make up for it. I would much rather do this than grind the concrete. Let me know what you guys think, thanks in advance
