The wife wanted me to wire her office first as my workshop would take longer and she didn't mind that hers would the done on the learning curve.
I've rewired stick built homes but never touched conduit. So I present my first example of pure amateur work with conduit.
Her office is 28' x 14'. The building was contracted, the only work I did on the building was write the check.
The lighting is LED 1700 lumen @ 4100K. The lamps are 8.5' above the floor.
I've rewired stick built homes but never touched conduit. So I present my first example of pure amateur work with conduit.
Her office is 28' x 14'. The building was contracted, the only work I did on the building was write the check.