I found a steel building needing to be torn down. Problem is it is way too big for my needs. It was a commercial building. I know I can put up just part of the building, but a guy can never have too much of a shop right? Just throwing an idea out there, and I'm sure I'll get alot of responses on how retarded I am. Here goes my question. There is no way I can pour all the concrete to floor this building. I was thinking of pourin just the footer and the area I need as the main shop. The rest would be unheated storage. I would build a wall to keep the area seperate. They are going to tearup the cement floor in there. I was wondering if anyone thought it would be practicle to concret saw the slabs and haul them away and reuse them in the cold side of the storage area, instead of paying for the gravel in that area. The building also has a large leanto on it and I would place slabs out there and as drive way up to that area. I have the semi and trailer to haul the slabs and a crane to unload them and errect the building. Sorry if this is dumb just wanting to bounce ideas off you guys.