wantacoe
Well-known member
I want to put a dividing wall in my pole building. I am getting old and tired so I decided I would hire the work out. I only had one guy show up to give me a price. The wall is 50x16, 2x6 studs, 16" on center. It will need to be framed for a 36" door and a 9x7 garage door. I am supplying the lumber, he brings nails and cement anchors. He isn't licensed or insured so I won't use him anyway but, he wanted 5K to do it and said it would take him 3/4 days with 4 people. I thought that was way way high and should not take 4 people more than a day. What do you think? PS: I guess I will be doing it myself.
