larry4406
Well-known member
Before I pull any wire, I figure I should ask the subject question.
My project has 1", 2", and 3" PVC Schedule 40 conduits. I have male terminal adapters at all conduit ends - panel box and PVC junction box.
This thread indicates that bushings are needed anytime that #4 or larger wire is used.
https://forums.mikeholt.com/showthread.php?t=150908
This thread indicates that bushings are not needed when PVC terminal adapters are used.
https://diy.stackexchange.com/quest...need-a-termination-bushing-at-a-service-panel
My barn feeder will most likely be 2/0. The lighting and outlet circuits I have not yet sized but I am thinking the outlet circuit will be #8 while the lighting maybe #10. The wire sizing discussion for my project is here https://www.garagejournal.com/forum/showthread.php?t=426420
For grins, I opened up the septic sub panel at my house (picture attached). It is connected with PVC conduit and flexible liquid-tite conduit. The CDR 6 AWG wire enters on the left and it is bushed while the wires to the pumps and controller exit on the right and are not bushed (I don't know their wire sizes). This panel was installed by an electrician prior to our purchase when the seller installed a new septic system. So I don't think I learned anything from this example.
My project has 1", 2", and 3" PVC Schedule 40 conduits. I have male terminal adapters at all conduit ends - panel box and PVC junction box.
This thread indicates that bushings are needed anytime that #4 or larger wire is used.
https://forums.mikeholt.com/showthread.php?t=150908
This thread indicates that bushings are not needed when PVC terminal adapters are used.
https://diy.stackexchange.com/quest...need-a-termination-bushing-at-a-service-panel
My barn feeder will most likely be 2/0. The lighting and outlet circuits I have not yet sized but I am thinking the outlet circuit will be #8 while the lighting maybe #10. The wire sizing discussion for my project is here https://www.garagejournal.com/forum/showthread.php?t=426420
For grins, I opened up the septic sub panel at my house (picture attached). It is connected with PVC conduit and flexible liquid-tite conduit. The CDR 6 AWG wire enters on the left and it is bushed while the wires to the pumps and controller exit on the right and are not bushed (I don't know their wire sizes). This panel was installed by an electrician prior to our purchase when the seller installed a new septic system. So I don't think I learned anything from this example.