dta1984
Well-known member
I'm building a 12'x16' shed and the area I'm putting it has a slight slope. I am using 4" thick " 16" L solid concrete blocks to help level. At the lowest point, I need to stack 2 of these blocks on top of each other. This method seems to be pretty common when I look around. I'm digging a few inches of the soil out, tamping, adding gravel and tamping again before sitting the block on top.
What I'm not sure of is if I need to put some kind of adhesive between the 2 blocks or not? Seems like they would be prone to sliding, but maybe not once everything is built in top?
What I'm not sure of is if I need to put some kind of adhesive between the 2 blocks or not? Seems like they would be prone to sliding, but maybe not once everything is built in top?
Last edited:
