Sokoloff
Well-known member
Running about 40' of grey PVC conduit between my house and the garage as part of a landscaping project. One of the runs is going to be 24" deep 2" for a future garage feeder and crosses a 5' wide sidewalk. On top of that in the same trench will be another 1.5" (or maybe 2") for low voltage.
How clean/perfect do I need to keep the joints? Under the sidewalk seems like it's going to be fairly sloppy mess or a much larger excavation project to get conduit in place that's never touched any soil/mud particularly as the sidewalk is fairly close the house, preventing the digging of a large pit on the house side.
Can I reasonably put the conduit in place and then just wipe it down well before gluing it up, trusting that it doesn't need perfectly surgical cleanliness?
Scale of 1-10, where 1 is hammer it through soil and glue it up blindfolded in the dark and 10 is surgically clean, how perfect am I aiming for?
How clean/perfect do I need to keep the joints? Under the sidewalk seems like it's going to be fairly sloppy mess or a much larger excavation project to get conduit in place that's never touched any soil/mud particularly as the sidewalk is fairly close the house, preventing the digging of a large pit on the house side.
Can I reasonably put the conduit in place and then just wipe it down well before gluing it up, trusting that it doesn't need perfectly surgical cleanliness?
Scale of 1-10, where 1 is hammer it through soil and glue it up blindfolded in the dark and 10 is surgically clean, how perfect am I aiming for?