So I hired an Electrician to remove my old maxed out service panel and not-to-code sub-panel and replace it with a new 42 slot panel.
The guy doing the work for the Electrician said they would need to change the main lines that come in from the meter to the new panel since the old lines were not long enough to reach.
The best I can describe how they come in is --- the electric is underground, comes up to the house up the wall into a meter box and there is another meter box that then goes down the wall through elbows into the basement and then into the service panel.
They spliced the main line coming as shown in these photos.
The guy doing the work for the Electrician said they would need to change the main lines that come in from the meter to the new panel since the old lines were not long enough to reach.
The best I can describe how they come in is --- the electric is underground, comes up to the house up the wall into a meter box and there is another meter box that then goes down the wall through elbows into the basement and then into the service panel.
They spliced the main line coming as shown in these photos.
Last edited: