I’m building a 48x48 pole barn shop and I have a slope on my property.
I can get millings 5 miles up the road from a highway paving outfit.
Lowest corner is 30” but averages around 10”
Has anyone used millings for fill??
I obviously would compact in 5-6” lifts, on top of #2’s (for drainage), on virgin clay.
I need 200t for the barn and lean to’s and millings are cheaper than rock in Southern Indiana.
Any help is appreciated!!
I can get millings 5 miles up the road from a highway paving outfit.
Lowest corner is 30” but averages around 10”
Has anyone used millings for fill??
I obviously would compact in 5-6” lifts, on top of #2’s (for drainage), on virgin clay.
I need 200t for the barn and lean to’s and millings are cheaper than rock in Southern Indiana.
Any help is appreciated!!
