There is a lot of debate on what is the code compliant way to do a load side solar tap. I currently have a junction box below my meter base with a number of Polaris connectors in it for my solar tap. It was passed by the inspector.
What the tap does is feed the load center in my detached garage and then the solar is fed by a breaker off of that panel.
I want to upgrade the feed to the garage which requires larger wire. I can't get larger wire into the junction box as it is packed tight. Is it code compliant to buy a new Milbank 200 amp meter base and use the special lugs Milbank sells to add a tap? This means the feed to the garage can only be de-energized by pulling the meter.
Is it allowed to put a breaker ahead of the tap at the service entrance? I am looking at putting in a meter main to get ahead of the 2020 code. I don't want future work after the 2020 code goes into effect later this year to trigger the emergency disconnect requirement. Some 320/400 amp meter mains even have two main breakers, but would I be allowed to use one main breaker for the solar/garage feed? (Would use 320/400 amp base for 200 amp service as allowed by utility.)
What the tap does is feed the load center in my detached garage and then the solar is fed by a breaker off of that panel.
I want to upgrade the feed to the garage which requires larger wire. I can't get larger wire into the junction box as it is packed tight. Is it code compliant to buy a new Milbank 200 amp meter base and use the special lugs Milbank sells to add a tap? This means the feed to the garage can only be de-energized by pulling the meter.
Is it allowed to put a breaker ahead of the tap at the service entrance? I am looking at putting in a meter main to get ahead of the 2020 code. I don't want future work after the 2020 code goes into effect later this year to trigger the emergency disconnect requirement. Some 320/400 amp meter mains even have two main breakers, but would I be allowed to use one main breaker for the solar/garage feed? (Would use 320/400 amp base for 200 amp service as allowed by utility.)