My building is due to be delivered in the next few weeks. Looking for some tips on how to go about running wire and mounting boxes. I think the side panels will be horizontal so I could use the channel in them to run the wire right? Self tappers to mount boxes to? Bought 3 extra trusses so the upright tubes will be every 3 1/2 feet instead of 4 1/2 feet. I do eventually plan on insulating. I do not plan on framing and building teal walls inside like I’ve seen some people to so everything will have to mount to the 12ga 2” x 2” square tube. Shop will see fab work as well as machine tool work and building race cars and maintaining and housing at least one race car