bill9860
Well-known member
The pad for my 26w x 28d detached garage was poured Friday and and the builder wants to cut control joints. Not sure it is a good idea, bad idea or just a "why not" because it doesn't hurt anything.
I have had two houses with unheated garages that had no cuts. The first one was 20+ years old and no cracks. The current house is 15 years and no cracks.
This detached garage will be heated and have a 2 post lift. I realize the last thing I need is a crack headed toward one of the floor plates. This is a floating slab sitting on a lot (say a foot or so) of compacted gravel if that makes a difference.
Thanks in advance for your views.
I have had two houses with unheated garages that had no cuts. The first one was 20+ years old and no cracks. The current house is 15 years and no cracks.
This detached garage will be heated and have a 2 post lift. I realize the last thing I need is a crack headed toward one of the floor plates. This is a floating slab sitting on a lot (say a foot or so) of compacted gravel if that makes a difference.
Thanks in advance for your views.
