Newbie here. Apologize if I should have built on a previous thread. I have read previous generator interlock threads about those trying to power both panels of a 2 panel 320 amp split service, with one generator. I have 2 main panels as well, but for me, all the loads I want to power are one panel. So any reason given my setup shown in the pictures that I cannot just use one interlock on that panel? I would have a 30 amp generator inlet outlet installed outside and run into the panel and connected to a 30 amp generator breaker in the correct position for the interlock.
All the previous threads seem to suggest that this fine but want to check before I proceed. My panels are fed by the trough shown in the picture and although I did not want to open it up, I assume the panel's neutrals and grounds are joined based on continuity tests I did at the panels.
Also question about the neutral. Since the interlock does not switch the neutral, why does this not create a parallel neutral situation where the generator power can flow either back to the generator via the generator circuit and/or out to the transformer via the service neutral?
Thank you in advance
I

All the previous threads seem to suggest that this fine but want to check before I proceed. My panels are fed by the trough shown in the picture and although I did not want to open it up, I assume the panel's neutrals and grounds are joined based on continuity tests I did at the panels.
Also question about the neutral. Since the interlock does not switch the neutral, why does this not create a parallel neutral situation where the generator power can flow either back to the generator via the generator circuit and/or out to the transformer via the service neutral?
Thank you in advance
I