Hi, by end of wednesday should have my 300 sq.ft of new pavers laid. Traditional install, solid base of gravel and then 1" sand. Trouble is there is about 1" rain forecasted for Thursday, likely before I can get the joint sand in. Should I cover the pavers to prevent washing out? I can scrounge up some tarps but not sure if I need to worry about it.
 
To avoid these ads, REGISTER NOW!

woodscaper

Well-known member
Joined
Aug 18, 2013
Messages
106
Location
central pa
With that much, I would cover it. Showers would be ok, but that's a bit much. Using polysand as filler I assume?
 

glentre

Well-known member
Joined
May 21, 2016
Messages
909
Location
Gloucester, Virginia
Had the same problem with pavers around my pool as the pool was an irregular shape and took several days to get the pavers cut and in place doing the job alone. Much larger than your 300 sq ft. I bought a huge piece of clear plastic from Home Depot and covered it every night, laying pavers on it to keep wind from blowing it away. A cheap and effective solution. Buying the plastic on line would be even cheaper.

Glen
 

Bulldog13

Well-known member
Joined
Sep 20, 2007
Messages
1,793
Location
Cape Coral ,FL
Definitely cover it…don’t want to wash out your work and have to start over 👍
 

Attachments

  • 2079B3D2-48A6-4ABD-8258-6D62489708B2.jpeg
    2079B3D2-48A6-4ABD-8258-6D62489708B2.jpeg
    616.9 KB · Views: 72

Leaflessshadetree

Well-known member
Joined
Aug 1, 2013
Messages
7,211
Location
Don't ask.
The first time I laid pavers the ones I laid first "moved" or shifted a little as I was placing more.
I started doing the joints part way as I go (so I get some sand in a few rows back from the side I'm working).
 
To avoid these ads, REGISTER NOW!
OP
C

couch67

Well-known member
Joined
Mar 18, 2016
Messages
1,430
Location
Ontario Canada
lol. thanks for the feedback. tarped it all in, will see how much we get in the next few days. Supposed to be dry for 3-4 days after so that will be perfect to get the joint sand (poly) in
 