OP, yeah, the utility or utility contractor will come out to the meter and do a quick check. Usually, when they're sent out, it's to replace the meter not try to fix it or anything else. Quick swap. That's because it's not worth the money to have the tech test it on site. Easier to just replace it and be done with it.
As for how they'll charge you, that'll be depend on if the meter was still capable of recording usage or not.
If it was and there's a good read in it, they'll get the read before swapping out the meter. That read will be sent to the utility billing system.
The new meter they install, if a new AMI meter, will start out with a zero read.
The previous read the tech captured will be used, along with what ever new read is collected after the meter is replaced to give you your new bill when your bill is due. Make sense?
If the meter was not able to get a good reading and the meter was really broken, then they'll replace it and the utility usually estimates your next bill based on previous usage history. Most if not all PUD's allow this.
As for how they'll charge you, that'll be depend on if the meter was still capable of recording usage or not.
If it was and there's a good read in it, they'll get the read before swapping out the meter. That read will be sent to the utility billing system.
The new meter they install, if a new AMI meter, will start out with a zero read.
The previous read the tech captured will be used, along with what ever new read is collected after the meter is replaced to give you your new bill when your bill is due. Make sense?
If the meter was not able to get a good reading and the meter was really broken, then they'll replace it and the utility usually estimates your next bill based on previous usage history. Most if not all PUD's allow this.