Well-known member
Hi,
My foundation and slab for my 32x48 garage should be poured probably within the next month. I have not determined my layout inside for electrical, etc, I figured I would do that down the road.
When i run the electrical i was just going to have the electrical come up through an LB and into the wall of the building, but researching I keep seeing posts saying if you do that, you cannot have the panel mounted between the studs? I am trying to determine why you cannot?
I keep going back and forth seeing if i should put conduit in the slab for the electrical when they pour or just wait till later and do it after.
I guess my question is why cant i have electrical come through an LB into the building and have my electrical panel still mounted between the studs?
Thanks for the help on this stupid question.
My foundation and slab for my 32x48 garage should be poured probably within the next month. I have not determined my layout inside for electrical, etc, I figured I would do that down the road.
When i run the electrical i was just going to have the electrical come up through an LB and into the wall of the building, but researching I keep seeing posts saying if you do that, you cannot have the panel mounted between the studs? I am trying to determine why you cannot?
I keep going back and forth seeing if i should put conduit in the slab for the electrical when they pour or just wait till later and do it after.
I guess my question is why cant i have electrical come through an LB into the building and have my electrical panel still mounted between the studs?
Thanks for the help on this stupid question.