cmalinowski
Member
Hi all. Thanks for previous help. I am getting ready to lay my loops and was planning to put my loops' start/end in a crawl space below the slab level. I'm wondering if this is okay. Seems like it would be hard to fill to some extent (was planning on glycol since I'm not here in northern NY a lot in deep winter), and maybe getting air out would be PITA, but are there other issues I should be concerned about in doing it this way? And, yes, the loops would be exiting the slab horizontally into the wall and then curving down to the plumbing in the crawl space. Crawl space is ~4.5ft high.
Thanks,
Chris