MolsonCanadian
Member
- Joined
- Sep 16, 2016
- Messages
- 5
Hey everyone, finally got to post something here!
We moved into this place last July, and one of the conditions (with the wife) was that I get a shop, the last shop, as this is our "last home". So we went big.
60x40. Heated floors. 2 10x10 overheads and only one man-door. 2 post lift in the far bay, a parking bay, and the rest for projects, hangout, lounge area.
Heated floors with back up gas overhead heater. 14' ceilings and an attic loft for storage. Started planning last year, digging May 1 2022, floors poured a couple weeks ago and trusses delivered today. Framing next week, hopefully.
We moved into this place last July, and one of the conditions (with the wife) was that I get a shop, the last shop, as this is our "last home". So we went big.
60x40. Heated floors. 2 10x10 overheads and only one man-door. 2 post lift in the far bay, a parking bay, and the rest for projects, hangout, lounge area.
Heated floors with back up gas overhead heater. 14' ceilings and an attic loft for storage. Started planning last year, digging May 1 2022, floors poured a couple weeks ago and trusses delivered today. Framing next week, hopefully.


