Recent content by alkech

  1. A

    Finished with the 24 x 48

    Its a stick frame that took me a year to build. Outsourced the building. Hired and fired one electrician and finished the electrical myself via Youtube and questions here; did the insulation, drywall, and paint. It has (3) 220s and lots of 110s. This time of the year is suggesting a future...
  2. A

    Finished with the 24 x 48

    Yes, exactly.
  3. A

    Finished with the 24 x 48

    Yes. I have been eyeballing the epoxy floor threads here. If I can manage to keep it from getting cluttered up from now till it thaws out, that's next.
  4. A

    Finished with the 24 x 48

    Just finished my detached, and wanted to say thanks for all the help with my electrial and drywall. When things thaw out on goes the exterior paint. Here's some shots, can't wait till I recoup a little financially and get started with the builds. [/URL][/IMG] [/URL][/IMG] :beer: Thanks again
  5. A

    Electrical final inspect fix

    Many thanks for the firm response, I will go this route.
  6. A

    Electrical final inspect fix

    I am getting the feeling I should just leave them as is and use the appropriate wire. As mentioned, right now I have Romex connecting them. So, could I just splice the Romex and wire nut the stranded to that, and then shove the wire nuts in the drywall so all you would see is the stranded...
  7. A

    Electrical final inspect fix

    Yes, Simkar offers a variety of attachments to mount to the ceiling, although I did not use them.
  8. A

    Electrical final inspect fix

    Thanks for your response. I have Romex connecting them now. Could I just wire nut the appropiate size stranded to the Romex and connect?
  9. A

    Electrical final inspect fix

    Thanks for your response. They are 4' foot tandems. I have 10 hard mounted already and didn't get any grief about them. Just assumed if I hard mounted the last two like the other 10 it would suffice?
  10. A

    Electrical final inspect fix

    Thought the electrical final would be a breeze, but got a finding. Didn't know fixtures hung by chain needs connected with stranded wire, not solid. I only have two on chaings, all the others are afixed to the ceiling. So can I conclude if I just removed these fixtures off the chains and...
  11. A

    Detached Final Inspect

    First time to the forum, didn't know it was so international. Washington State.
  12. A

    Detached Final Inspect

    About to finish a 24 x 48, but was curious how detailed the final is. I do have separate electrical, and that is bought off. There will be no plumbing. I am about to insulate and drywall. Do they both need to be inspected prior to final, or can I just get those done and do the final? Thanks.
Top Bottom