I have a bunch of these fixtures that I got from a demo, and 2'x2' fixtures as well. How many of these can I string together on a 15A circuit, or am I better going with a 20A?
It's a 30'x32' with 12' ceilings. I am thinking 10 of the 2x2' fixtures and a row of the 4x2's in the middle.
Sent...
HVAC, welder, lathe, drill press and maybe a milling machine. I do not plan on using 100A but I would like the option down the road if necessary.
Sent from my iPhone using Tapatalk
I have had a few local electricians tell me I should use 1/0 copper on the hot legs, #2 on the neutral and #6 on the ground. Sound right? I do all the work myself but the last thing I want is to do it again because an inspector has a problem with it. Thanks.
Sent from my iPhone using Tapatalk
Any one know what size wire I will need for a 210' run of direct burial to a 100A sub panel? Main 200A panel is in basement, underground to new pole barn from there. Thanks in advance.
Sent from my iPhone using Tapatalk
I have a heavy 3'x12' steel bench (1 1/4" thick top). Should I mount one vise on each end? Just curious what everyone thinks? Thanks
Sent from my iPhone using Tapatalk