Recent content by bigsmith7227

  1. B

    Concrete rebar options

    Thanks for all the input guys. I'm going to take care of it when I do the drain tile. Pre drill holes in the beam and sill plate and insert allthread for the top and dowel into existing slab just forsafe measure. Pour footer and wall same time
  2. B

    Concrete rebar options

    to be clear on what I was doingI was going to pour on the inside and use the existing concrete that the beam sits over top as a footer but you guys are right it doesn't make much sense because I will already be there while I'm putting drain tile on outside
  3. B

    Concrete rebar options

    Appreciate it. Thank you
  4. B

    Concrete rebar options

    I have been searching around and haven't found anything similar to my situation. After I lay drain tile on the perimeter of my building to solve the water issue that is washing out my foundation. I want to pour a solid wall formed from 2 bys and plywood. My question is what are my options for...
  5. B

    Barn reno

    About 10 miles north of frederick md
  6. B

    Barn reno

    This is what I'm working with. I call it the barn Reno. 2 bay sliding barn door, half concrete floor/half dirt. The barn does have a pit and temporary electric. Some of the block foundation needs redone and the tin roof is beyond repair. Here are a few pictures I snapped tonight while replacing...