Getting ready to form up my concrete. Gonna have some sidewalks and a 20x10 approach. Wondering if I should break it up into 2 pours. I plan on installing rebar pins and adding a lot of rebar. I wanna just have one pour of 4.25 yards w fiber mesh. Anyone with experience doing this? Thanks
Hello all. I have been reading hundreds of these threads and have learned a lot. My garage has a 45 foot run of 1.5 and 2 inch pvc conduit. My electrician wants to use 2224 al wire. (which I'm good with). We plan on putting a 100 amp breaker in my main house panel to feed the new garage. My...
had 2 goals. Has to fit in w neighborhood / house. And do every last part myself. Chickened out on floating the slab (cost me $1900) and the shingling (costs me $1000) Under 30k so far. needs a driveway, power, and gas yet.
Thinking bout sheathing and bracing for winds. Wonder if putting my hip set trusses on before sheathing walls would be the route. Front header going up tomorrow. Ordered a 24 foot 2x6 for the top plate for the 16' 9" header. Tie it nice to the front wall. The pics make my walls look unlevel.
Gonna sheath it like this on the front wall. Bought (9)12 footers. The other 6 will go on corners vertically. Then 4x8 vertically the rest of. Blocking at 2’6” from floor.