I'm an electrical engineer, too, and grew tired of the repeated outages due to the policies of the utility company (they no longer properly clear rights of way, so there are LOTS of big trees hanging over the lines). And I'm not even in a remote area . . .
Solution was a 22 kW Generac/Eaton...