Forget the cutting, use Zip Strips when pouring the floor. Both of my shops have these and I have only a fine line where the natural cracks follow the Zip Strip thus eliminating the cutting and wide, unsightly, lines that collect ****. 30 days is a good guideline before coating, given the right...