I used six Redi-footings, which use Schedule 40 PVC (sewer) pipe as structural members. My shed is 9x12', which was the maximum size I could build without a permit.
With the Redi-footings, you just excavate a hole below the frost line (48" where I am), put in the foot with the pipe, and...