Bought the 2x10x20 rafters tonight. Also bought the perlins and post! Need two more post. Didn't have enough at the lumber yard! Now is calculate my metal and get ready to buy! Had a little helper in one of my pictures.
Looks like I 6 1/4" up there to stick the board in. I could possibly move the 2x purlin at the end of the existing roof and move it up the roof to gain more space. I've attacked a picture of the tape measure by the existing truss. The second sketch is a question. Since I only have 6 1/4...
Yes Kreg pocket screw kit. If you do any wood working what so ever, a Kreg pocket jig is a must. I haven't had mine long but it's the best thing in the world for wood working.
Ok. Thanks for the clarification. Makes sense now. I was talking with a friend earlier and he suggested using a 16' 2x10 and a 5' one. Then sandwich plywood between two more with with the 5' on the 16' end and the 16' on the 5' end. Something like this picture. Probably overkill though. And...
OLDIRON: Thanks for the response. Yeahs I plan on having some dirt work done to move the hill back. I've already moved probably 6 dump truck loads. The hill was around 8 ft from the back of my shop before I started this project. My land is all shell and drains well but I understand and...
The grey building is mine and the inside with the lathe in the picture is mine. All the others are of his. He only went 15 ft and cost him 4000 dollars. I'm wanting to go 20' and do it myself!