No. I do alot of side work and Building anything and everything. I am going to keep it heated all the time it will have 90% natural gas furnace. I will be in it every day and have a large fabrication table i dont want to rust or worry about heating up everyday. All of my benches are also 1/4...
I am to this point in the project it is 17 out at the moment so not working on it till this cold snap breaks. I have 6x6 posts with 2x4 purlins on the out side and osb walls with vinly siding.None of witch is completed. I want to put 1 1/2 pink foam in between each purlin before i sheet it and...
Well this week end finally made alot of progress. Set poles saturday and then started framing it sunday. Trusses showed up today hope to get those set this week.
Well after selling out land and buying a place already done instead of building i get to start building my shop. Not as big as what i wanted to do but this will have to do for now. 28x36x12 and a lean 2 with a hip roof on north and west side of building. Here are some of the pictures as we moved...
That's awesome where I live in michigan I can do a floating slab only if it's 450 sqft or smaller. My footings and flat work and approach is flirting with 10k and that's with me doing most of site prep. That is gonna be a sweet building man congrats can't wait to break ground on ours. We're...
Im in Grand Rapids I could come split a bunch of wood for ya with my splitter in the next couple of weeks. Always up to help some buddy out until u can buy a splitter. How far east are you Ive lived in the area all my life and familiar with all surround areas I am a very avid waterfowl hunter so...
Very nice!! This is one of my favorite builds yet. My wife and I break ground in the spring I cant wait :bounce:. This site not only for the garages but house builds has given us so many new ideas. Congrats on a great place