Goosman
Active member
I am to this point in the project it is 17 out at the moment so not working on it till this cold snap breaks. I have 6x6 posts with 2x4 purlins on the out side and osb walls with vinly siding.None of witch is completed. I want to put 1 1/2 pink foam in between each purlin before i sheet it and then r22 denim insulation after that. I have already built 2x6 walls in between each post. And it will be dry walled inside. So my question is do i need a vapor barrier any where beside the tyvek?