    Adding more electrical after inspection pass

    Yes it's in use and probably no loops left in there for future work..It will probably remain where it is and will have the panel offset within the wall.
  2. H

    Adding more electrical after inspection pass

    Yes you are correct I was just wanting the ok to add a few receptacles fed romex only temporarily..the discussion of the panels was added because of talk of my final plan to stay with "visible" conduit/ metal boxes out of a fully exposed panel..or everything just put behind finished walls like...
  3. H

    Adding more electrical after inspection pass

    The outside panel conduit going underground to utility pole..the inside conduit to a sub on opposite wall.
  4. H

    Adding more electrical after inspection pass

    If had planned it right or at least got a suggestion from the electrician I'd had the panel set out flush with the post at least..I dont know what trouble it'd be to do that now
  5. H

    Adding more electrical after inspection pass

    thanks just wanting some reassurance that will be ok until my walls are finished out next year..I'm probably gonna redo the electricians work too..I like the metal conduit look for a work space but by time I run that everywhere and pull wire it would feel like a big expense for a 36x48 with...
  6. H

    Adding more electrical after inspection pass

    Awhile back my pole barn electric was done to a minimum by the electrician, just enough to pass so the power could be turned on..Now I wish to get some outlets for heat etc installed before it gets to cold. Question is should I go the route as the electrician(in pics) or just run stapled romex...
  7. H

    Need advice on a pole barn plumbing rough-in

    Can't answer your questions but I would think who does my septic would only be concerned at the shallow main drain pipe(but that depth is gonna change if I have to do it myself). ..by the way I not only had the wall staked and strung I also had my sill plate laid out with dimensions and...
  8. H

    Need advice on a pole barn plumbing rough-in

    My wall is to be 2x6's ..Im pulling my wall from the post(beside window in the pic). They veered the stubs the direction of the window. I cant bring my wall further right or I wont have room to trim out my windows. Damn windows weren't supposed to be right at the post(another story there)! Let...
  9. H

    Need advice on a pole barn plumbing rough-in

    No it's not..Not required on farm of 10 or more acres here in my county. A county here in in western Ky. I do have to sign off when pymt is to be made. I think signing a statement I understand that the plumber not required to pull a permit. However the septic will require those things at a later...
  10. H

    Need advice on a pole barn plumbing rough-in

    I posted last fall asking for advice on doing this rough in myself. Well with other things going on I decided to hire it out here recently. Today the rough in was completed by a local company and I'm not happy with how things were done. Especially after spending so much time researching this and...
  11. H

    Lawn tractor question..husqvarna

    Yes I do a Hobart..great beads with the thick steel but I **** out at the thin..starting to think I need .025 wire
  12. H

    Lawn tractor question..husqvarna

    That I will probably do..
  13. H

    Lawn tractor question..husqvarna

    Now that I wish I could do..My final frontier of tools the oxy acetylene setup😀