Last installment, this whole project was about 7 months to finish, plans are to install central air in the spring. Hope to add the 68 Chevelle soon. Shop area is 30 x 30 with storage(10X30)taking up the rest of the space.
Thanks to my wife for saying no to nothing, as a matter of fact the...