Foundation, fill, final grade, vapor barrier, insulation, then tubes:
Ditch left for new upgraded gas line (had 3/4", needed 1.25" if we ever wanted to put in a gas range in addition to the planned boiler). Also completed underground plumbing for two vented floor drains, "sink" drain for...