I ran into something like this on a job a few years ago ... took a while for me to get my head wrapped around it. Utility only had two phase conductors on the pole near the property. I had A, B, and G and C was missing. So, I could use A-B at x voltage, or A-G or B-G both at sqrt(3)*X voltage...