robs400
Well-known member
As the title mentions, I am in the middle of making what was originally a crawl space into a useable work space. Its been an ongoing project for nearly two years now and just last week I had a hole cut in the wall that will end up being a garage door. I have a lot of work left but the end is at least in sight, all tho still too far away for my liking.
I have talked to the concrete guy about a few little hiccups in the slab that make it slightly non-standard. In the discussions with him I brought up wanting a vapor barrier under the slab. He said this is standard, and typically 6 mil poly is used.
Reading into this lightly I found that 6 mil poly is not all that great tho. I really want to make sure this space is dry and want to do whatever I can at this stage in the project to help with that in the future. I have read that poly has a limited lifespan and eventually will disappear under the slab. How is this acceptable?
I'm looking for other options/input that people can suggest for a homeowners budget.
And of course a photo for good measure....
I have talked to the concrete guy about a few little hiccups in the slab that make it slightly non-standard. In the discussions with him I brought up wanting a vapor barrier under the slab. He said this is standard, and typically 6 mil poly is used.
Reading into this lightly I found that 6 mil poly is not all that great tho. I really want to make sure this space is dry and want to do whatever I can at this stage in the project to help with that in the future. I have read that poly has a limited lifespan and eventually will disappear under the slab. How is this acceptable?
I'm looking for other options/input that people can suggest for a homeowners budget.
And of course a photo for good measure....


