Recent content by mattgarrett

  1. M

    Garage/Office Started

    That was the idea (seamless) when I did the design. So far so good. Sometimes doesn't work out the way you plan.
  2. M

    Garage/Office Started

    Yeah, sorry about that. I had some really big pics and I couldn't get them resized so I copied them off of the other site. WHen I did though it posted them with only about 11kb (really small). I will try to fix.
  3. M

    Garage/Office Started

    These latest photos are within the last three weeks. I have some more to post. Sorry for the photo dump but didn't find this forum until midway through the build. Enjoy.
  4. M

    Garage/Office Started

    Some more pics of my project 1, garage plus carport 2, house plus garage 3, carport area 4, new toy
  5. M

    Garage/Office Started

    We are changing out the shutter to wood board and batten shutters. The front columns on the house are coming off and being replaced with wood columns and the front bean above the columns is being wrapped with rough cut cedar to match my back porch and the carport addition between the house and...
  6. M

    Garage/Office Started

    New outside pics. The Tyvek and the windows will get taped and sealed as the siding go on this week. Hopefully the copper eyebrows can get done too. The boulder retaining wall and the extended flagstone patio gets attention this week as well.
  7. M

    Garage/Office Started

    I had to make a decision on the garage floor. I was going with epoxy but couldn't get the color I wanted so my next decision was Aspart-x from line-x. Well I had one of the local line-x was going to use me as a guinea pig and do it for cost (which was still really expensive) but they felt they...
  8. M

    Garage/Office Started

    some more, 1st one is full kitchen, 2nd is half bath and stairs leading down to garage, 3rd dining or conference area ;-), 4th is garage. will take some of outside today.
  9. M

    Garage/Office Started

    Here are some interior pics. 1st one is living area, 2nd one is one office, 3rd one is my office, 4th is tile shower.
  10. M

    Garage/Office Started

    Sheetrock should be done in the next couple of days. Bricks are going up as well. Siding on the dormers should start next week too. Flooring, bath tiles and trim should start as well. Unpacked my Modulines and they are awesome. I am really impressed with the build quality. My flagstone patio...
  11. M

    Garage/Office Started

    few more. 1 st one is the ceiling in my office. It will have a coffered ceiling. 2nd is my office it has a full bath in it. 3rd is carport/breezeway - it will be tongue and groove with wood wrapped beams, 4th is view from my office managers office of the carport/breezeway, 5th is area under and...
  12. M

    Garage/Office Started

    Some more. 1st is kitchen and conference area, 2nd is sitting area with laundry room and have bath in back corner, 3rd is my office managers office, 4th is view of entrance to stairs, bath room on left, laundry room far left, last one is my office.
  13. M

    Garage/Office Started

    Here are some inside pictures. 1st picture toward stairway leading up to office. The mechanical room is the room on the left - tankless water heater, compressor, central vac, structured wiring center for cable and ethernet, furnace. 2nd picture looking toward front of garage, hopefully lift will...
  14. M

    Garage/Office Started

    Here are some more pics. 1st and 2nd picture taken from main house garage. 3rd taken from across the street.
  15. M

    Garage/Office Started

    Couple of days after the previous picture and we have snow.
Top Bottom