Are you in the Charlotte area? Im just guessing that by your product choice. Or maybe the Raleigh area.
Im usually around 120sq ft per gallon for my epoxy basecoat. Another thing I like to do is after I squeegee and backroll the epoxy, I let it kick for a little bit before broadcasting the...
Who manufactured the flakes that you are using? The choice is pretty much Torginol or Estes, but I am guessing since you are using Duravel products, you are using Estes Flakes. I have heard of issues with Estes flakes having moisture issues and creating similar issues to what you are...
Yea I just use a twin tube caulk gun, but I buy the Euco twin tube cartridges. They do sell that stuff in bulk part A and part B where you would need to mix it but not with the cartridges. The cartridges all come with a mixing tip.
At least in my area, the batch plants get the integral color from the same supplier I get it from as a concrete contractor. The only difference is they will just throw the color into the mixer in the "dissolvable bags" that dont always dissolve, where as I dont put those bags in the mixer...
You have a quite a few options for colored concrete floors.
During the pour you can use:
-Integral Color - This is usually a mix of granules (powder) that is mixed into the concrete truck, and colors the concrete all the way through. Sometimes the batch plants have liquid dyes that I have...
Agreed. Looks like two different pours....just not sure why whichever pour was first had such a wonky edge.
But your approach is one of two options I would consider as a simple repair.
The other approach would be almost identical, except instead of a rigid polyurea crack filler like that...
Wet grinding is an option, but it’ll make a hell of a mess and wouldn’t recommend it with a hand grinder. It’ll create a slurry which you’ll have to figure out a way to remove and dispose of. Dry grinding with a vac attached is probably a much more painless option.
Yea that’s probably why you are having a bad dusting issue. Concrete needs a minimum of 30
Days (officially they say 28 days) before any grinding happens so the concrete didn’t cure properly. I’m sorry for your unfortunate situation!
You can grind it with your handheld grinder, it’s going to be...