I have a new main panel, with a 200 amp service, and when I installed it, I routed a 1-1/4" flex conduit from the panel into the basement to allow for a future garage subpanel. Well, the future is now, I'm doing the subpanel, and I'm trying to pull 3 4AWG THHN conductors and 1 6AWG ground...