I used a recommended GC through Muller Buildings. He was based out of Maypearl. Overall everything was great our concrete guys kind of sucked. here is the details of my build:
30 x 40 x 14 (16' peak) Insulated
2 10 x 10 Doors - Insulated
2 windows
1 walk door
Total build = $36K -(about...
Nice build! I like the door and the facade. Seems like the Mueller build is popular among the Tx group. You're making me wish I would've done a stone facade to match the house.
It stays 5-10 cooler until around 3-4 ish in the afternoon then it is almost equal. I plan on putting a 4 unit split system in eventually.
You got a much better deal on your slab..... Any pics for how you finished yours out?
Faster346 - Sorry I had a limited amount of time... Lights are in and garage door openers are installed (Lift master 8500) along with ethernet lines run. In the coming months before the end of the year. Had some things come up that took priority unfortunately.
Plans:
1) Finish walls in 60/40...
Dlwfish - It was one of the recommended. There was some pros and cons throughout the process. In the end it was overall ok. If you send me a PM and i'll give you some more info and contact info if you'd like.
UPDATE:
Rain finally stopped long enough to get the concrete poured last week. After 10 days of curing construction of the building started earlier today.
That was the option either run up the side and tear up the grass but would've had to wait until the ground was dried up. Or do the pump truck, the contractor admitted he made a mistake and asked if we could split the cost to go ahead and get it done or else we would just wait. Obviously I...
As for rough layout plans see attached.
The list I have which will come in stages are:
1) Back right hand corner will be 10x15 approximate "Lab" for a cleaner work environment enclosed
2) Being plumbed for a sink
2) four post lift for storage of my toys
3) 2 post lift 9K for working area
4)...
Replacing links with actual photos.
Anyone in the DFW area remember or know what their pump truck for cement cost? I am little bit irratated that after receiving quotes from 3 different contractors and taking the middle one due to personal reference he mistakenly forgot to include the pump...