Recent content by teamextreme

  1. T

    Baseboard material for garage?

    I used left-over Trex decking ripped in half.
  2. T

    Busway Busbar Busduct for garage

    What you describe is only used in industrial settings and is designed for 480v and high current applications and is stupid expensive. No way that expense would make sense in a home shop.
  3. T

    Steel Post Base Sizing; Q for Structural Engineers

    The purpose for mine is to provide shade; in the form of 2 shade sails that will be installed between the beams in the summer. They will be removed for winter to avoid snow loads.
  4. T

    Steel Post Base Sizing; Q for Structural Engineers

    I thought I would provide an update on this project. It's all complete now and I'm very happy with how it turned out. So far it hasn't fallen over :)
  5. T

    Steel Post Base Sizing; Q for Structural Engineers

    Unfortunately nobody has chimed in yet. I am really curious as to the details of the concerns. I understand your statements about bending moment, etc., however there should be minimal wind load and uplift due to the fact that the overhang portion is completely open and only consists of a pair...
  6. T

    Steel Post Base Sizing; Q for Structural Engineers

    36" deep. Weldable rebar? You've got to be shitting me. Never heard of such a thing. It's steel, it's weldable. I'm not building the Hoover dam here. Rebar is not even required in this application by my City, I added it to go above and beyond. Care to elaborate? Am I screwing something...
  7. T

    Steel Post Base Sizing; Q for Structural Engineers

    Thanks for the replies! I pulled the trigger and poured yesterday. I used a triangle structure of 1/2" rebar welded together. Here is some additional info on the structure since people are asking... Dig Doug posted several pics of base connection examples and it brings up another question...
  8. T

    Steel Post Base Sizing; Q for Structural Engineers

    If you look at the drawing I included, the 8" baseplate corners touch the edge of the 12" footing. The 8" baseplate fits on the 6" column as shown in the drawing, but if you rotate the baseplate 45 degrees to "normal" alignment, the bolt holes and corners of the post are on top of each other...
  9. T

    Steel Post Base Sizing; Q for Structural Engineers

    You mean use a square sonotube? There's a post about that right now where the poster wants to use square and can't find it and everyone is explaining the reasons why (bad idea, too much force on a square structure).
  10. T

    Steel Post Base Sizing; Q for Structural Engineers

    Not an issue and not uncommon, great! That's what I suspected and was hoping to hear. The top of the column will be free standing, I guess you'd say, with a wood beam mounted at an angle, close to horizontal, "cantilevered", the post being its only support. Interesting alternate technique you...
  11. T

    Steel Post Base Sizing; Q for Structural Engineers

    I'm building a cantilevered pergola using square steel posts with a base plate anchored to concrete caissons with J-bolts in the concrete. When I was sizing things I thought 4" posts would likely be plenty strong, but I wanted a more substantial look, so I went with 6" posts. The largest...
  12. T

    Between 485 & 705 SQ/FT Tinkering Tony's Workshop

    They make PVC LB's that would eliminate your corrosion concerns and also play well with the PVC you should be using for underground anyway. Alternatively, depending on the length of offset you're dealing with and conduit routing configuration, you could bend the PVC using heat and create an...
  13. T

    Running Wire from outside (sub-Panel) mounted to stucco to inside garage, how to do it by code?

    Why won't a RT fitting fit on the rear? If you're coming into the back with any type of cable/conduit/fitting then a RT fitting should also fit. It will require augering out a bunch of stucco for clearance, which will be a PITA, but that will have to be done no matter how you enter the back of...
  14. T

    Between 485 & 705 SQ/FT Tinkering Tony's Workshop

    Fine looking finished product. You need a few more things on your to-do list on the white board!
  15. T

    Between 485 & 705 SQ/FT Tinkering Tony's Workshop

    If you do decide to run the poly underground gas line, let me know, I have the special, pricey-ish tool for dressing the ends you can borrow. I think I ran 1" to my shop.