My Versatube user guide clearly shows under foundation requirements that the slab should be building width + 6" and the building length + 3". This is to allow for the hat channel and for the sheeting ledge that my cement guys failed to add. On top of that the slab is 25' x 25' for a 24 x 24...
All good suggestions but it looks like I'll take the low budget approach and caulk for the time being. Some additional landscaping, including a french drain, is planned for the yard in that area for next year.
The slab is above grade (I'm in a flood zone) and, like KenC, the pad is wider than the building. Bad design? I agree now but it is what the manufacturer requires in their plans. I didn't know better at the time but I sure do now.
Polyurethane or butyl rubber caulking is probably going to be my...
I'm looking for suggestions on sealing the bottom plate to the concrete floor on a Versatube metal building. Yesterday I was working on the inside when it started raining and I noticed water coming in from under the steel bottom plate and the floor.
It was pretty bad in a couple of places and...
I can understand your concerns. In the ten years I've been here south of Tombstone and Bisbee I've seen a few snakes and scorpions but lots of black widows. But I moved here from Oklahoma where we had all those things plus tornadoes. I do not miss hearing the alarm sirens go off.