  1. T

    Between 705 & 1200 SQ/FT Seven year itch is finally getting scratched

    Yeah I purposefully wired the new AC into the old panel so that no matter what stage the new shop is in, the AC could be running. I waited until the lights were wired and everything checked out ok before insulating the attic, so once I get that done next week it will be an ice box if I want.
  2. T

    Between 705 & 1200 SQ/FT Seven year itch is finally getting scratched

    On to hanging the lights. I used a laser to make sure the mounting screws for each light were in the right place, and gutted one of the lights to use as a marking template. I used Toggler nylon self drilling anchors that do a good job biting drywall and are easy to use. 18 lights put up over the...
  3. T

    Between 705 & 1200 SQ/FT Seven year itch is finally getting scratched

    More (slow) progress. Painters did a good job given the circumstances. Work distractions pulled me away for a few weeks but I finally got to installing the lights and discovered another planning failure. I installed regular ceiling boxes for the lights and it didn't occur to me that just...
  4. T

    Between 705 & 1200 SQ/FT Seven year itch is finally getting scratched

    Yeah it was pretty sloppy but the inspector was ok with it and he's been very picky.
  5. T

    Between 705 & 1200 SQ/FT Seven year itch is finally getting scratched

    The drywall crew got the texture applied and sanded, now it's back in my hands to get ready for paint. My intention was to paint it myself, but I really, really hate painting so I'm going to let the pros do it. To help reduce the expense, I'm cleaning up the drywall mess, masking everything up...
  6. T

    Between 705 & 1200 SQ/FT Seven year itch is finally getting scratched

    A flurry of activity over the weekend- drywall and stucco moving toward completion. We had our first truly hot week of the year, so I feel bad for these guys working in the heat, but they're not as miserable as I would be since I'm not used to being out in it. The final stucco coat went on when...
  7. T

    Between 705 & 1200 SQ/FT Seven year itch is finally getting scratched

    The photos can be a bit deceiving- the outlets are 48” off the floor. My doors are 8’ tall, so it makes the windows and outlet boxes look closer to the floor. That wall is for machinery- there are 3 outlets for 220v so I’ll have my mill, pantograph, and welder along that wall, with the lathe on...
  8. T

    Between 705 & 1200 SQ/FT Seven year itch is finally getting scratched

    Big milestone reached yesterday- drywall has been hung. 60 sheets of 4x12' 5/8" fire X so about 3 tons added to the building. Inspection passed so taping will start tomorrow morning.
  9. T

    Between 705 & 1200 SQ/FT Seven year itch is finally getting scratched

    Finished up the insulation over the weekend and I'm very happy to have this job behind me. The inspector came and signed off on the bracing and fire stops required on the west wall (garage door wall) so I could get it finished and ready for drywall. I had plenty of extra Rockwool, so I decided...
  10. T

    Between 705 & 1200 SQ/FT Seven year itch is finally getting scratched

    Fun weekend in the books. I hate insulation and I can’t wait to be done with it. Despite precautions I think my skin will be red and swollen for a week. After a work trip this week I’ll have the changes inspected, install the last wall of insulation, then turn it over to the drywall guys...
  11. T

    Between 705 & 1200 SQ/FT Seven year itch is finally getting scratched

    Wow that’s quite the interesting phenomena. Having lived in central Texas for many years I’m not terribly surprised by the higher incidence of lightning strikes. I’m curious if an area like Tampa, Florida sees more house fires since I’m sure they use RBS as well and the area is well known for...
  12. T

    Between 705 & 1200 SQ/FT Seven year itch is finally getting scratched

    Very jealous of the spray foam. I just couldn’t justify the cost.
  13. T

    Between 705 & 1200 SQ/FT Seven year itch is finally getting scratched

    One wall down last night...my stack of insulation didn't shrink much though. Lots more to do.
  14. T

    Between 705 & 1200 SQ/FT Seven year itch is finally getting scratched

    Yeah I'm happy with the end result. Be sure and get the smallest connector that will handle the wire size you're using- they all have a range of sizes they can accommodate and bigger is not better. These are 4-14 gauge compatible and are nice and small. There were only 5 of them in stock so my...
  15. T

    Between 705 & 1200 SQ/FT Seven year itch is finally getting scratched

    Finally on to the part I've been really dreading. Fortunately my F150 helped me keep an eye on the tall load.