Recent content by w4hsa

  1. W

    Long slow build...but worth it......

    Sent from my iPad using Garage Journal
  2. W

    Long slow build...but worth it......

    Started building sub base for drive. Geotex to support mot type 1. Sent from my iPad using Garage Journal
  3. W

    Long slow build...but worth it......

    Sent from my iPad using Garage Journal
  4. W

    Long slow build...but worth it......

    Sent from my iPad using Garage Journal
  5. W

    Long slow build...but worth it......

    Actually considered hiring a mini digger and doing this myself, however the disposal of removed soil/clay was going to be difficult so called in the pro's. Surprisingly cost effective and done in a single day plus once dug out earth takes much more space than I anticipated - at least 15-20...
  6. W

    Long slow build...but worth it......

    Well after a long delay...... Sent from my iPad using Garage Journal
  7. W

    Long slow build...but worth it......

    Actually yet to use for vehicle projects, need to transfer toolboxes, lift etc etc. Next big job is to dig out the drive. Power - actually running from a long extension cable until I dig out a trench (when I do drive) Sent from my iPad using Garage Journal
  8. W

    Long slow build...but worth it......

    The hinges are in two parts, a rod screwed to the frame and a tube type receptor screwed onto door. The door can only be lifted off when it is opened to 90 degrees. It’s a security door with about 8 locking bolts around the door perimeter. To be honest the door is the most secure aspect of...
  9. W

    Long slow build...but worth it......

    So I can watch the six nations a tv was next on my list This was actually second attempt at wall support, the first using cable tray was too flimsy and twisted/flexed so I cut down a spare piece of c section I had kicking about. The bracket is form a company called Vogel, they are top...
  10. W

    Long slow build...but worth it......

    Thanks bugnut Sent from my iPad using Garage Journal
  11. W

    Long slow build...but worth it......

    Chimney fitment continues Finally my first fire... Sent from my iPad using Garage Journal
  12. W

    Long slow build...but worth it......

    The keeping warm theme continues with a wood burning stove. First had to decide where to put it (making best use of space, decisions, decisions) Managed to buy a second hand Aga stove that came with some chimney sections as previously fitted. Have to secure in place and purchase some...
  13. W

    Long slow build...but worth it......

    Finally underside of roof sheets And used all my offcuts to finish the area at the bottom of the walls Sent from my iPad using Garage Journal
  14. W

    Long slow build...but worth it......

    Particularly pleased with how it fits behind beams and into corners. Now the roof, gravity no longer helping Sent from my iPad using Garage Journal
  15. W

    Long slow build...but worth it......

    Ok....now I’m all in on the 50mm rigid foam board Sent from my iPad using Garage Journal