    Atlas FM9SL Scissor Lift Flush-Mount Install

    At the top under the cover I had a 2p breaker with L1 (black wire) & N2 (Blue wire) with a factory cord down below, below above the pump I mounted the transformer to bump down from 240v to 220v. Basically it’s the your connecting your 220v to L1 & N2
  2. W

    Atlas FM9SL Scissor Lift Flush-Mount Install

    I can go out and post a couple pics of the connection if you need. I remember calling tech support on this and was connected as if it was L1 & L2, the labeling they used was confusing
  3. W

    Detached Garage Power

    I would install a 200A fusible service rated disconnect within 6’ of the meter and run 4/0 4 wire feeder to the garage and leave the 200A main in the panel. Then install a 110A set of fuses in the disconnect. Label the disconnect “Service Disconnect for Garage” Wayne
  4. W

    Have a 4" box in drywall but need to add external box, any way to do so?

    Have a 4" box in drywall but need to add external box, any way to do so? Nope, all good for code Sent from my iPhone using The Garage Journal mobile app
  5. W

    Have a 4" box in drywall but need to add external box, any way to do so?

    Install a single P-Ring to flush out with the drywall then add this extension box
  6. W

    Electrical in shop 240 conduit

    Oops, correct Try - ME 3100R6W IP67 is 250v 100A 5hp, this is a little pricey but I would like to move it when needed. Sent from my iPhone using The Garage Journal mobile app
  7. W

    Electrical in shop 240 conduit

    Another option is to install a 240v 50A receptacle in for your disconnect, that was if you need to move it just unplug Sent from my iPhone using The Garage Journal mobile app
  8. W

    What can go into a trench?

    All in the same trench is fine on private property. Hold minimum depth per code. My conduits sleeves are at 4’— 4’-6” due to the water pipes 1” for soft water 1” for hard water 1” for DATA 2” for power 2” for gas 1-1/2” for air back to the house Wayne
  9. W

    Price of osb way up!

    Re: Anybody else not doing projects due to cost of lumber? I started a 60x40 With a high bay to store a RV, last fall I finished the concrete and earth work and the lumber prices went up. I thought I would just wait it out and nope.... every part of the project when up. Wayne
  10. W

    Stimied on dead recepticals

    Also check light switches that you don’t know what they control, they could be a switched
  11. W

    Stimied on dead recepticals

    If they are standard receptacles check other GFI receptacles to see if there is one tripped
  12. W

    Atlas FM9SL Scissor Lift Flush-Mount Install

    1st off I would like to thank you all for the incredible postings. I wish I have found this before I started. I took the last 4 hours reading this thread and it has a wealth of information, I’m currently in the middle of building me a barn and installing (2) flush floor lifts FM9SL and a...
Top Bottom