@Mr onetwo. I'm glad I did the single colour, as IMO the multi-coloured flakes don't look right. You don't see that type of finish in commercial and industrial applications.Wow, really looks great! Another step done![]()
@Mr onetwo. I'm glad I did the single colour, as IMO the multi-coloured flakes don't look right. You don't see that type of finish in commercial and industrial applications.Wow, really looks great! Another step done![]()








I've done a few builds in Australia over the years, and I would say that is indeed a good question and I guess building practices vary over the world. A friend of mine used to live in Hong Kong, and told me that the usual practice for a bathroom was to lay all the tiles in an empty room, then bash holes through all the tiles , install plumbing , then replace all the broken tiles ( I do not know if this was actually true, surprised me to be sure !!).Just curiouswhy lay tile before the drywall isn't at least primed?
@Mr onetwo @Coolabah is on the right track in terms of the trade order and bathroom walls can cop a bit of splash when the tiler lays the screed floor.Just curiouswhy lay tile before the drywall isn't at least primed?
















Indeed, and I guess order can change depending on Trades availability etc- bear in mind they'd rather attend once rather than twice, which I totally understand@Mr onetwo @Coolabah is on the right track in terms of the trade order and bathroom walls can cop a bit of splash when the tiler lays the screed floor.
The main determining factor in this case is the painting was being done by spray painting which is becoming very common to achieve very high standard finishes. So, the process demands reducing the likelihood of damage to painted surfaces post painting. Hence all possible trades, where possible, are completed before painting.
Hence, the order here is: 1) door jambs, door headers, door/window trim before tiling where tiles are laid to meet these, 2) floor screed laid, floor tiling and some wall/skirting tiles, 3) staircase treads and risers, 4) door jambs, door headers, remaining door/window trim and skirting boards, 5) test fit and resize doors as needed, cut handle recesses etc. 6) cabinetry, 7) tile splash backs, 8) painting...
I don't know Geoff, not to be critical (see what I did there ?) that certainly sounded exactly like most very critical comments that I've heard . Even if your assumption is correct, I'm not sure it needed to be said. Tile deals vary from state to state in Aus, and good on you for finding a cheap deal. Interestingly, in my recent build I purchased similar floor tiles through the cheapest supplier I could find- Beaumont tiles, who were also having a sale at the time. I picked up the tiles from their store to save delivery fee, and they were very helpful when I needed more tiles from the same batch in a hurry due to a tiler's apprentice snafu.Not to be critical, but your choice of tile supplier suggests you like wasting money as much as Coolabah does. Maybe they were having a sale.
No doubt that's a bit harsh of me but on reading that bit of your update I recalled finding the floor tile we had picked, the exact same tile, at a non-descript tile place without a big fancy showroom display for exactly half the price of the place you got yours.
Anyway, your place is coming along very nicely and there seems to be an increasing risk of it being finished, for which I bet you can't wait.
Yeh, winding you up of course but upon re-reading my post , I might have overdone it a bit :shock:Greg, two possibilities come to mind.
The first is that I've unintentionally actually offended either you or Kitdoctor. If so, I unreservedly apologise. The point was not to be critical of either of you, rather to be critical of the large, prominent tile supplier he used, and the margins they place on their products. Who do you think pays for those flashy showrooms and displays? Including you in the comment was, in my mind, just continuing the banter we've enjoyed on here for years. I note that I have always been positive in my comments about this impressive project, including in my last paragraph above.
The second is that you're actually winding me up now, in which case well done.

@Coolabah, yes certainly and there's always a few tasks that get mostly finished but there's a nagging bit left unfinished.Indeed, and I guess order can change depending on Trades availability etc- bear in mind they'd rather attend once rather than twice, which I totally understand![]()
@Geoff289, I'm not offended at all. Even I know they are expensive but they were the only tile supplier my builder held an account with.The first is that I've unintentionally actually offended either you or Kitdoctor. If so, I unreservedly apologise.