Search results

  1. 9

    Quikrete curing time

    I had a 4x5 pad 12" thick poured with Quikrete 5000 for my MaxJax installation. On the Quikrete website it says it will reach 3500 psi strength in 7 days. The full 5000 in 28. When is a good time to drill and install the epoxy anchors for my MaxJax? I'm going to wait for at least the 7 day...
  2. 9

    MaxJax installlation tips

    I know there are several very long threads that have tips and info spread through out, but I thought one more couldn't hurt. :thumbup: The instructions say to use a 5/8'' bit to start the holes while the column is in place. Since the holes in the base are 7/8", that leaves a little more room...
Top Bottom