Search results

  1. F

    Ghostshield 8510 install

    111 85303
  2. F

    Ghostshield 8510 install

    Saturday is the install day... Just hopping the tempature won't affect the install too much.. Above 100 degrees all the time now days
  3. F

    150amp subpanel

    Here are the pic's
  4. F

    150amp subpanel

    Not really asking about a specific part, just figuring out what is commonly used. I'll grab a few pictures of my main panel in the morning. The panel is for a one man garage/shop @ 1,300sf. Its attached by a common wall (breezeway). I can run power through the wall and not have to trench...
  5. F

    150amp subpanel

    Going to return the wire tomorrow and get 1/0...
  6. F

    150amp subpanel

    So an item like this is what is recommend to pull power off the main panel? https://www.amazon.com/dp/B002KGFTXU/?tag=atomicindus08-20
  7. F

    Ghostshield 8510 install

    Did you spray on the Ghoshshield or roll it on?
  8. F

    150amp subpanel

    Ok, let's start from the beginning... What is the preferred method of pulling power off the main panel?
  9. F

    150amp subpanel

    ............. yea. I got a good deal on it.
  10. F

    150amp subpanel

    Fed off my main 200amp panel. I'm debating on either pulling off the main feed (always hot) or installing two 70amp breakers. I went with two runs of #4 cooper as it showed #4 rated 85amps each. I don't think I will ever use 150amps but it was the only one I could find with 15slots, above...
  11. F

    150amp subpanel

    Is copper a better choice then aluminum? From my reading, I would need 2/0 in aluminum correct?
  12. F

    150amp subpanel

    I'm installing a 150amp subpanel to my new garage. The run is about 125ft, my research shows that I need two #1 copper lines for that long of a run. Does this sound correct?
  13. F

    Ghostshield 8510 install

    Installing Ghostshield next weekend, anyone have some tips, tricks, or pic's?
  14. F

    Ghostsheild 8505 vs 8510?

    Care to post some pics of your floor?
  15. F

    Damn concrete is expensive :(

    2 months ago: -40 tons of AB fill - $800 -4 hours of grading work and foots dug -$350 -2x10x16's x 12 foundation framing - $195 -(200) 1/2 x 20' rebar - $475 -30 yards of 4000 psi and labor - $3,700 -pump truck 4 hours $600 32x41 slab, did as much as I could myself.. Built forms, compacted...
  16. F

    Truss diagram questions

    Thanks, got worried when I was informed the total weight of the roof tile... 18,000 pounds.
  17. F

    Truss diagram questions

    That space between the top and bottom chord is designed for AC unit. Question: TCLL = Top Chord Live Load (Yours 20 pounds per sq ft, or psf) Using the above, my sq footage of my roof is 1,550... so 20 psf x 1,550 = 31,000 pounds. Does this mean my roof will support 31,000 pounds?
  18. F

    Truss diagram questions

    Could you explain a little more on this: "On the bottom chord, they want 2x put on top of the bottom chord to stabilize and prevent the truss from moving."
  19. F

    Truss diagram questions

    Few questions.. could someone explain what Bracing it's asking for? Also, where do I find the weight load for this truss design? Picture below:
  20. F

    Wall stud height

    Yep, the extra height from top/bottom plates are accounted for.
Top Bottom