Hi All, Brand new member long time lurker.
In the planning stages of a build and I as curious as the best way to handle a ' below grade ' situation. Looking at about a 6'8' difference.
Tall foundation walls and backfill?
Raise area with fill ?
Size would be 24.5 w x 32 L max peak height...