Looking for some opinions to see if I’m on the right track. I’m building our house, it’s a post frame construction, 50’ trusses spaced 4’ O.C., purlins are 2’ O.C., I plane on going 1/2” OSB with clips. Is this sufficient, lacking, or could I go 7/16” OSB and be ok?
Thanks everyone,
Adam