I'm in the process of planning a 36 X 60 shop (thread to follow). Specs are calling for foam board, 10 mill vapor barrier, mesh on chairs and the hydronic tubing wired to the mesh. The contractor doing the hydronic system thinks that here in NC that the bubble wrap is good enough and that the...